Watt controls every layer from dirt to driver, so we can stand behind price, performance and delivery.
Permitted parcels co-located with generation. No grid queue, no leased racks.
Long-dated hydropower with on-site substations and battery firming.
Liquid-ready halls densified for 130kW+ racks of Blackwell-class silicon.
Non-blocking Quantum-2 InfiniBand, 8-way NVLink nodes, rail-optimised topology.
Spot, reserved and forward contracts, all indexed to WATT-CPI.
Jurisdictional data residency, isolation and compliance by design.
Size your allocation and lock a forward rate with a 12.5% deposit.
We allocate powered racks and stand up your isolated cluster.
Draw GPU-hours on demand at your locked rate across the term.
Mark, roll or cash-settle each contract against the published index.
| Node | 8× GPU NVLink |
| Fabric | Quantum-2 InfiniBand (non-blocking) |
| Topology | Rail-optimised fat-tree |
| Cooling | Direct-to-chip liquid ready |
| Rack density | 130kW+ per rack |